Show the whole route
Use the main collection and final delivery fields, then list additional stops in route notes. Include full postcodes, what is collected or delivered and any fixed order.
If the load changes along the route, explain which units travel between which points. This affects space, weight and the loading sequence.
Plan multi-stop freight enquiries around your Oldbury access
For Oldbury freight, obtain a goods-vehicle entrance from the consignee instead of routing through a nearby public car park. Published height limits at Oldbury parking sites make vehicle clearance a separate question from the load fitting inside the truck. Confirm gate width, overhead clearance, yard capacity and unloading equipment, and give a contact who can admit the vehicle.
Obtain the seller or site operator’s release instructions and the equipment needed to load safely. Declare unusual contents, fragile parts and anything that cannot be stacked before suitability is assessed.
- Check the named Oldbury car park's height limit and the actual loading entrance before choosing a vehicle position.
- For multi-stop freight enquiries, prepare: every stop and postcode; goods per stop; required stop order.
Account for time at each address
Add opening hours, site appointments and unloading arrangements for every stop. A convenient route still needs to fit the available access windows.
Ask for all stops and waiting arrangements to be included in the agreed quote. Extra addresses are not automatically included in a single collection-to-delivery price.
Your Oldbury enquiry checklist
- For multi-stop freight enquiries, have these details ready: every stop and postcode; goods per stop; required stop order.
- Give both full postcodes and identify the exact entrance and receiving point. B69 is a location reference, not the whole service area.
- Explain any unresolved permission, timing or handling question before accepting a quote.
- Check the quote’s supplier, price, inclusions and booking terms before confirming.

